Page 21 - ABB_Surface-mounted_junction_boxes
P. 21
21
Installation methods: Two strain-reliefs can be used on In the middle.
the opposite sides of the box
Installation with one strain-relief with AP9 and AP10 boxes.
Installation Make sure that the cable tie is secured
Attach the strain-relief to the junction box, push the cable around the strain-relief before tightening
through the membrane inlet. Attach the cable tie around the the cable tie. When the cable tie has been
cable and strain-relief. tightened and the installation is complete,
make sure that the strain-relief is secured
by pulling firmly at the cable in an
outward direction.