Page 21 - ABB_Surface-mounted_junction_boxes
P. 21

21

Installation methods:                 Two strain-reliefs can be used on  In the middle.
                                      the opposite sides of the box
 Installation with one strain-relief  with AP9 and AP10 boxes.

Installation                                                  Make sure that the cable tie is secured
Attach the strain-relief to the junction box, push the cable  around the strain-relief before tightening
through the membrane inlet. Attach the cable tie around the   the cable tie. When the cable tie has been
cable and strain-relief.                                      tightened and the installation is complete,
                                                              make sure that the strain-relief is secured
                                                              by pulling firmly at the cable in an
                                                              outward direction.
   16   17   18   19   20   21   22   23   24