Page 25 - PlanWorld_2011_en_high
P. 25

The new addition to
the Planmeca campus
is designed by architect
Juha Larkas.

The project for the new addition of Planmeca        robot-operated warehouse space for these     Planmeca's President Heikki Kyöstilä is             25
production facilities reaches soon its goal. The    functions.                                   satisfied with the project.
new premises are located within a walking         •	 Production of Planmeca’s top-quality
distance from the Planmeca headquarters             dental units will be situated in the second     “Planning the building started only in April
in eastern Helsinki suburb of Herttoniemi,          floor of the new building.                   last year, and despite the extremely rough
Finland. After completing the new 118,000         •	 The third floor will be dedicated to our    winter conditions, the construction stayed in
square feet annex building the company              subsidiary in medical imaging equipment,     schedule.”
occupies total of 475,000 square feet.              Planmed. Both Planmed offices and pro-
                                                    duction will move into the new building.        “With new production premises we can
   This summer the new facility is opened:          Thus, Planmed’s high-quality mammogra-       more effectively respond to the increased
•	 The ground floor will be occupied by our         phy units as well as the 3D imaging device   demand and at the same time improve the
                                                    for extremities, Planmed Verity, will be     reliability of deliveries.”
  technologically advanced metal workshop           produced there.
  as well as the powder painting depart-
  ment. In addition, the ground level has

Planmeca’s unique dental education concept takes over South East Asia

Planmeca has signed a delivery agreement          sul­tation between the students and the        philosophy in the early stage of their
with the International Islamic University         faculty.                                       profession. These university deliveries are
Malaysia (IIUM). In co-operation with                                                            a fundamental part of our business”, says
its local distributor Amedix sdn. Bhd                Although treatment tradition in the         Mr Tuomas Lokki.
Planmeca supplies the IIUM with 173               area favours hanging tube instrument
Planmeca Compact i and one Planmeca               delivery IIUM chose Planmeca dental               The agreement with IIUM is one of
Sovereign dental units, three Planmeca            units with over-the-patient delivery           the first university deliveries in South
ProMax 3D imaging systems, and 7 digital          contributing to ergonomics and hygienic        East Asia. Planmeca’s local distributor
Planmeca Intra and Planmeca ProSensor             work environment.                              Amedix has years of experience of large
intraoral imaging systems.                                                                       delivery projects and is strongly present
                                                     “In the Asian market, the competitive       in the area supporting Malaysian dental
   In the IIUM’s case Planmeca’s system           assets of Planmeca’s dental equipment are      professionals. The installations have
e.g. notifies about unit maintenance              superior design and simplicity of use, both    already begun.
routines and offers centralised suction           promoting efficient workflow. We are
system and amalgam separators. The                happy that young professionals become          International Islamic University Malaysia website:
software platform enables remote con­             predominant users of the latest technology     www.iium.edu.my
                                                  and familiar with the Planmeca’s product
   20   21   22   23   24   25   26   27   28   29   30